Saturday, April 19, 2008

Blacked In!


We were hoping to be blacked-in last June or July, so we're only a couple of months late! David and Bobby installed the last of the french doors yesterday (they still need a little work, but they're in). David has finished the rough-in plumbing and is correcting some of the "minor" framing errors before he gets into the electrical. When he tried to fix the top step on the interior stairs, he found out that the whole flight was installed out-of-square, so he needs to bust it loose and re-install it. Not a small task.

The HVAC sizing is done and we got the drawings for the duct work. Unfortunately the hard drive on our computer crashed a couple of weeks ago, and we lost our copy of autocad so it'll take a bit of work to get the ducts into a form that we can get quotes on.